Articles new!
New Air Intake Filtration System® for gas turbines
Advantages of new system:
- Compactness – the reducing size to place 2nd and 3rd step of filtration system.
- Increasing the arae filtration of prefilters more 100%.
- Reducing the pressure drop at 40-80 Pa.
- Increasing the efficiency of gas turbine at 0.06-0.12%.
- Increasing the life time of pre filters class G4 comparable with the fine filters class F8-F9.
- Reducing the maintenance expenses – not necessary to change pre filters during the operation of gas turbine at least for a year or more.